Introduction

        Hello, My name is Mark Arjay M. Arevalo. In this blog I want to share my experience in my job. I am currently QAQC Assistant in Construction. I am also working as a part time in a BPO company,  as "Data Analyst and Data Entry". I am very enthusiast about Technology although . I want to learn more about technology, I read e-books, watching YouTube videos and learning about new technology and trends.

      Now, let me show you my full time job as QAQC Assistant in Construction of 25MW Hydro Power Plant. This Hydro Power Plant  consist of Intake structure, Headrace Tunnel, Reservoir or Surge tank, Penstock and last but not the least Powerhouse. In this project I am in the consultant side. We inspect, approve, review, witness activities of the contractor and  also I, myself  checking of the Progress Billing of the contractor if there is an issued NCR on their billing.

Fig. 1 Intake Structure

Fig. 2 Tunnel


Fig. 3 Surge Tank / Reservoir
 In this location we are going to construct the surge tank. You can see in this photo the 5.8 diameter penstock and 5.8 diameter riser.


Fig. 4 Penstock 5.8 Dia.



Fig. 5 Powerhouse

Fig. 6 Switch Yard





Intended for Metering station




Fig.7 Metering Station



Temporary Facilities
Batching Plant


Testing Center conducting compressive testing of concrete cylinder sample.
Admin Offices
Contractors Offices












No comments:

Post a Comment

METHOD STATEMENT FOR CONSTRUCTION OF COPING BEAM

METHOD STATEMENT FOR CONSTRUCTION OF COPING BEAM 1. SCOPE OF WORK This method statement outlines the construction procedure for coping beam ...